Canopies 12 x 30 m
Indicative price
€100,360 excl. VAT
€121,440 incl. 21% VAT · Range €74,850 - €118,640 · That is €279 per m² excl. VAT
Indicative price excluding VAT, calculated by our published cost model for a level site in Belgium. The amount including VAT is shown at the standard rate of the delivery country (21% in Belgium and the Netherlands, 17% in Luxembourg). Prices for businesses are excluding VAT. The firm price comes from the quote, after the stability study for your site. Foundations, permits and architect not included.
Data sheet
- Dimensions (width x length)
- 12 x 30 m
- Floor area
- 360 m²
- Eaves height
- 4.5 m
- Roof pitch
- 5°
- Configuration
- Open (roof only)
- Roofing
- Single-skin sheeting
- Rooflights
- 10 %
- Gutters and downpipes
- yes
- Structural steel (estimate)
- 11,880 kg
- Snow and wind loads
- Standard (Benelux lowlands)
- Fabrication
- EN 1090-1 certified partner fabricator, execution class EXC2 by default
- Erection
- included
Assumption: level site in Belgium, standard loads, to be confirmed by the stability study.
Included in the indicative price
- Hot-dip galvanised steel structure, fabricated and CE marked by the partner fabricator
- Roofing, cladding, rooflights, barge boards, ridge flashings and gutters as per the data sheet
- Doors as listed in the data sheet
- Anchor bolts and anchoring plan
- Stability study for your site and calculation notes for the permit application
- Transport to site (lorry access required)
- Erection by a partner crew where indicated, with an allowance for lifting (final means and cost in the quote)
Not included
- Foundations, slab and groundworks
- Planning permission and architect fees
- Electrics, plumbing, interior fit-out
- VAT, except in the amount including VAT shown next to the price (21% in Belgium and the Netherlands, 17% in Luxembourg)
Calculation in detail
| Item | Quantity | Amount excl. VAT |
|---|---|---|
| Galvanised steel structure | 11,880 kg | €35,046 |
| Roofing | 325.2 m² | €3,578 |
| Rooflights | 36.1 m² | €495 |
| Barge boards, ridge flashings, fixings | 54.1 m | €682 |
| Gutters and downpipes | 60 m | €632 |
| Anchor bolts | 48 pc | €158 |
| Stability study and drawings | 1 lump sum | €2,500 |
| Transport | 1 lorry | €1,200 |
| Erection | 360 m² | €32,040 |
| Lifting plant | 4 day | €4,960 |
| Total costs | €81,291 | |
| Hallfort margin | €19,069 | |
| Central estimate | €100,360 |
Method and sources of the cost model